Chimney Crown Repair & Rebuild
Repair the crown before water gets into the brick.
The crown is the concrete slab on top of your chimney. It sheds water away from the brick. When it cracks — and North Texas heat cycles crack them — water runs into the masonry, freezes, and spalls the brick from the inside out. Crown work is cheap compared with the rebuild it prevents.
Before any work
Need a Repair? Free Inspection Before We Start the Work
We look first, photograph what we find, explain the visible condition and the options, then price the work. You decide before anything begins.
Applies to the initial evaluation before applicable repair, restoration, fireplace and masonry work. Dedicated inspections — real-estate transactions and specialized Level 2 or Level 3 inspections — are separate priced services.
What we do
- Hairline and moderate crown crack repair
- Flexible crown coating and sealing
- Full cast concrete crown rebuild with proper overhang and drip edge
- Crown replacement with correct expansion joint at the flue tile
- Waterproofing after crown repair
Signs you need this
- • Visible cracks across the top of the chimney
- • Spalling or flaking brick just below the crown
- • White efflorescence staining on the exterior
- • Damp firebox or musty smell after rain
- • Chunks of concrete found in the gutter or on the roof
Our process
Step 1
Inspect
We photograph the crown, measure cracking, and check whether the flue tile is intact.
Step 2
Scope
Repairable crowns get sealed. Failed crowns get removed and rebuilt — we tell you which you have.
Step 3
Rebuild
New crowns are cast with proper overhang, drip edge and an expansion joint around the tile.
Step 4
Protect
We recommend vapor-permeable waterproofing so the repair keeps working.
Chimney Crowns FAQs
- Can a cracked crown just be sealed?
- Sometimes. Hairline cracking usually seals well. Crowns that are crumbling, sitting flush with the brick, or missing an expansion joint need a rebuild.
- How long does a crown rebuild take?
- Most crown rebuilds are a one-day job, plus cure time before we waterproof.
